UbeeUbeestimate™

Cottage or vacation home · Single-storey · Detached · 1 dwelling unit · 2,252 sq ft

365 Chemin Critiques

Montebello · Autour de la rue Notre-Dame

Ubeestimate™ valuation
$613,500
Low confidence
$520,500$778,000

By a real estate broker · No obligation · Reply within 24 hours

Ownership history

Last change of ownership
March 3, 2017 9 years ago

Date the current owner was entered on the assessment roll. It is most often a sale, but an estate settlement, a gift or a new construction produces the same entry.

Source: property assessment roll (MAMH). Transaction amounts are not published on the roll; they appear in the Registre foncier du Québec (Quebec land register).

Comparable sales

Three recent sales in the area, with the price actually paid.

The assessment roll gives dates, never amounts. We look up in the Quebec land register (Registre foncier du Québec) what three comparable properties recently sold for, and what this address cost.

  • Comparable 1
    Sold · immediate area
  • Comparable 2
    Sold · immediate area
  • Comparable 3
    Sold · immediate area

By email, within 24 hours. Includes the last sale registered at this address.

Get the transaction report

Three comparable sales in the area and the record for this address, within 24 hours.

Is it to sell or to buy?
You’re an owner

The real estate broker you’d expect, without paying what you’d expect.

Sell it yourself
You’re looking to buy

This property isn’t for sale. Be the first to know if it is.

Surroundings and accessibility

Transportation
EV charging stationFairmont Château Montebello · Level 2571 m
Education
Elementary schoolÉcole Saint-Michel1.3 km
Services and amenities
ParkParc1.2 km
Grocery storeBoni Choix1.7 km
Wired high-speed internet available in the area50/10 Mbps or more · Based on ISED data for the area. Actual service varies by provider.

Description

This cottage or vacation home is located at 365 Chemin Critiques, in Montebello. Built in 1968 (58 years old), single-storey and detached, it offers 2,252 sq ft of living space on a single storey. The 2026 property assessment sets its value at $508,200 (land: $108,400, building: $399,800), an increase of 27.8% since the previous roll. The lot measures 40,403 sq ft.

The property

Land use (CUBF)
Cottage or vacation home
Type
Cottage or vacation home
Number of dwelling units
1
Living area
2,252 sq ft · 209.2 m²
Number of storeys
1
Year built
1968 (actual)
Building type and attachment
Single-storey · Detached
Lot area
40,403 sq ft · 3,753.6 m²
Frontage
94.7 m
Roll number
9157-26-4322

Financial details

Assessment roll 2026 · market as of July 1, 2024

Land
$108,400
Building
$399,800
Total assessment$508,200
Previous roll
$397,600
Change+27.8%

Value history

+78.1% since 2017
Ubeestimate™ estimateMunicipal assessment
2026$613,500estimated$508,200assessed20172026

The municipal assessment is the value entered on each year’s roll (rolls are prepared every three years). The estimate applies our model’s market-value-to-assessed-value ratio to that base. Hover over the chart to see each year. For information only.

Neighbourhood profile

2021 Census · Statistics Canada

Around rue Notre-Dame

The immediate neighbourhood of the property (census dissemination area, about 400 to 700 residents), not all of Montebello. Dissemination areas have no official name: the landmark above comes from the streets within the area.

Population of the immediate area
542
65 people/km²
Median age
55 years
12.0% aged 0 to 14
Median after-tax income
$56,400
11% lower than in Quebec
Homeowners
84.0%
245 private households
Population and households
Population542
Population density65 people/km²
Private households245
Average household size2
One-person households36.7%
Age profile
Median age55 years
Average age50 years
Aged 0 to 1412.0%
Aged 15 to 6457.4%
Aged 65 and over30.6%
Income
Median after-tax household income$56,400
Median total household income$62,400
Low income (after-tax LIM)10.4%
Housing
Owners84.0%
Renters16.0%
Median reported dwelling value (2021 Census)$220,000
Single-detached houses75.5%
Apartments8.2%
Condominiums8.0%
Average rooms per dwelling6.5 rooms
Dwellings built before 198060.0%
Dwellings built since 20160.0%
Dwellings needing major repairs0.0%
Education and employment
University degree (bachelor’s or higher)14.6%
Employment rate55.2%
Unemployment rate11.7%
Participation rate62.5%
Languages and diversity
Knowledge of French only45.0%
Bilingual (French and English)53.2%
Immigrants3.6%
Recent immigrants (2011–2021)0.0%
Commuting
Commute by car93.6%
Commute by transit0.0%
Commute on foot4.3%
Commute by bicycle0.0%

Population trend

-8.6% since 2001

All of Montebello · annual estimates from the ISQ

2025973 residents20012025

Population estimates as of July 1, Institut de la statistique du Québec (ISQ) (2001-2025). Recent years are revised or preliminary.

Data from Statistics Canada’s 2021 Census, aggregated for the property’s statistical area (dissemination area) and not for the property itself. The bar shows the difference from the Quebec average. Values suppressed for confidentiality reasons are not shown.

Water supply

The municipal drinking water distribution system in Montebello serves 1,240 people out of a population of about 973. Water source: surface water (lake).

Source: directory of municipal drinking water distribution systems, Quebec Ministère de l’Environnement, de la Lutte contre les changements climatiques, de la Faune et des Parcs. The directory describes where the water comes from and the size of each system; it contains no test results and does not say which addresses are connected.

Radon

In the Outaouais region, homes tested by Health Canada had a median concentration of 47 Bq/m³, and 12.7% exceeded the Canadian guideline of 200 Bq/m³, out of 63 measurements.

This figure describes a region, not this property. Radon is a natural gas that comes from the ground, but its concentration in a home depends on cracks in the foundation, the drainage and the ventilation: two neighbouring houses can differ by a factor of ten. Only a long-term test on site gives the actual concentration. Test kits cost a few dozen dollars and must stay in place for at least three months during the heating season.

Source: Cross-Canada Survey of Radon Concentrations in Homes, Health Canada, long-term measurements collected from 2009 to 2011. It is the most recent survey published at this scale.

Other properties on Chemin Critiques

See the whole street →

Montebello has 26 properties classified as cottage or vacation home on the property assessment roll.

Data transparency

Public data

Quebec property assessment roll 2026 (MAMH, open data). Owner names and cadastral data are redacted at the source.

Ubeestimate™ valuation

Statistical model adjusted for the local market, the building’s characteristics and the neighbourhood context. The property is assumed to be in standard condition.

Disclaimer

These estimates do not replace a professional appraisal and are not binding on Ubeestimate™.