Single-family home · One-and-a-half-storey · Detached · 1 dwelling unit · 2,736 sq ft
491 Chemin Critiques
Montebello · Autour de la rue Notre-Dame
By a real estate broker · No obligation · Reply within 24 hours
Ownership history
Date the current owner was entered on the assessment roll. It is most often a sale, but an estate settlement, a gift or a new construction produces the same entry.
Source: property assessment roll (MAMH). Transaction amounts are not published on the roll; they appear in the Registre foncier du Québec (Quebec land register).
Three recent sales in the area, with the price actually paid.
The assessment roll gives dates, never amounts. We look up in the Quebec land register (Registre foncier du Québec) what three comparable properties recently sold for, and what this address cost.
- Comparable 1Sold · immediate area
- Comparable 2Sold · immediate area
- Comparable 3Sold · immediate area
By email, within 24 hours.
Includes the last sale at this address, if it took place after 2003.
This property isn’t for sale. Be the first to know if it is.
Surroundings and accessibility
Description
This single-family home is located at 491 Chemin Critiques, in Montebello. Built in 1994 (32 years old), one-and-a-half-storey and detached, it offers 2,736 sq ft of living space over 2 storeys. The 2026 property assessment sets its value at $541,100 (land: $84,400, building: $456,700), an increase of 24.7% since the previous roll. The lot measures 40,393 sq ft.
The property
- Land use (CUBF)
- Dwelling
- Type
- Single-family home
- Number of dwelling units
- 1
- Living area
- 2,736 sq ft · 254.2 m²
- Number of storeys
- 2
- Year built
- 1994 (actual)
- Building type and attachment
- One-and-a-half-storey · Detached
- Lot area
- 40,393 sq ft · 3,752.6 m²
- Frontage
- 102.6 m
- Roll number
- 9057-83-3783
Financial details
Assessment roll 2026 · market as of July 1, 2024
- Land
- $84,400
- Building
- $456,700
- Previous roll
- $434,000
Value history
+80.7% since 2017The municipal assessment is the value entered on each year’s roll (rolls are prepared every three years). The estimate applies our model’s market-value-to-assessed-value ratio to that base. Hover over the chart to see each year. For information only.
Neighbourhood profile
2021 Census · Statistics CanadaAround rue Notre-Dame
The immediate neighbourhood of the property (census dissemination area, about 400 to 700 residents), not all of Montebello. Dissemination areas have no official name: the landmark above comes from the streets within the area.
Population trend
-8.6% since 2001All of Montebello · annual estimates from the ISQ
Population estimates as of July 1, Institut de la statistique du Québec (ISQ) (2001-2025). Recent years are revised or preliminary.
Data from Statistics Canada’s 2021 Census, aggregated for the property’s statistical area (dissemination area) and not for the property itself. The bar shows the difference from the Quebec average. Values suppressed for confidentiality reasons are not shown.
Water supply
The municipal drinking water distribution system in Montebello serves 1,240 people out of a population of about 973. Water source: surface water (lake).
Source: directory of municipal drinking water distribution systems, Quebec Ministère de l’Environnement, de la Lutte contre les changements climatiques, de la Faune et des Parcs. The directory describes where the water comes from and the size of each system; it contains no test results and does not say which addresses are connected.
Radon
In the Outaouais region, homes tested by Health Canada had a median concentration of 47 Bq/m³, and 12.7% exceeded the Canadian guideline of 200 Bq/m³, out of 63 measurements.
This figure describes a region, not this property. Radon is a natural gas that comes from the ground, but its concentration in a home depends on cracks in the foundation, the drainage and the ventilation: two neighbouring houses can differ by a factor of ten. Only a long-term test on site gives the actual concentration. Test kits cost a few dozen dollars and must stay in place for at least three months during the heating season.
Source: Cross-Canada Survey of Radon Concentrations in Homes, Health Canada, long-term measurements collected from 2009 to 2011. It is the most recent survey published at this scale.
Other properties on Chemin Critiques
See the whole street →Montebello has 323 properties classified as single-family home on the property assessment roll.
489 Chemin Critiques
477 Chemin Critiques
461 Chemin Critiques
410 Chemin Critiques
376 Chemin Critiques
365 Chemin Critiques
Data transparency
Public data
Quebec property assessment roll 2026 (MAMH, open data). Owner names and cadastral data are redacted at the source.
Ubeestimate™ valuation
Statistical model adjusted for the local market, the building’s characteristics and the neighbourhood context. The property is assumed to be in standard condition.
Disclaimer
These estimates do not replace a professional appraisal and are not binding on Ubeestimate™.